AE EXCHANGE INJECTOR #8 CYL ONLY LONG LEAD
Industrial Injection 7.3L AE Power Stroke Reman Stock Exchange Injector
Industrial Injection 7.3L AE Power Stroke Reman Stock Exchange Injector
- 1999-2003 Ford F-Series, E-Series (Built after 12/07/98)
- Stock Replacement Injector for 1999-2003 Ford F-Series, E-Series (Built after 12/07/98) Diesels.
| Attributes | |
| Country of Origin (Primary) | US |
| Fuel Type | Diesel |
| Hazardous Material Code | N |
| Life Cycle Status Code | Available to Order |
| SDR Required Flag | N |
| GTIN | 00840256911930 |